QY-100

In Stock

Description

Driving status main parameter list

category project unit parameter
size

parameter

Full length Mm 17200
Full width of the machine Mm 3000
Full height Mm 4500
Wheelbase Mm 1950+4575+1375+1350
Track (front/rear) Mm 2022/1830
quality Total mass Kg 54000
power

parameter

Engine rated power Kw/(r/min) 297/2300
Maximum engine torque Nm(r/min) 1200/1200~1800
travel

parameter

Maximum travel speed Km/h 102
Minimum turning diameter m twenty four
Minimum ground clearance Mm 230
Approach angle ° twenty one
Departure angle ° 19
Maximum grade % 45

 

 Lifting operation status main parameter list

category project unit parameter
Main performance parameters Maximum rated total lifting capacity t 100
Rated working range m 3
Maximum lifting torque Basic arm KN.m 3850
Longest main arm KN.m 1250
Leg distance Portrait m 9.265
Landscape m 8.35
Lifting height Basic arm m 13.7
Longest main arm m 50
Longest main arm + jib 72
Boom length Basic arm m 13.2
Longest main arm m 50
Auxiliary arm m 72.5
Jib mounting angle ° 0, 15, 30
Working speed parameter Boom amplitude change time Arm s 150
Falling arm s 80
Boom extension time Full extension s 180
Full reduction s 150
Maximum turning speed r/min 2.0
Leg extension time Swinging leg Stretch 20 32
Shrink 55 20
Vertical leg Stretch 45 57
Shrink 70 38
Lifting speed single rope (wire rope on the fourth floor) Main hoisting mechanism (no load) From 85 130
Sub-hoisting mechanism (no load) From 85 120

 

 Crane lifting performance table

1. Main arm lifting performance table

Amplitude

(m)

Leg extension
Basic arm 13.2(m) Medium long arm 17.8(m) Medium long arm 22.4(m) Medium long arm 27(m) Medium long arm 31.6(m) Medium long arm 36.2(m) Medium long arm 40.8(m) Medium long arm 45.4(m) Full extension arm 50(m)
Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg Lifting weight Kg
3 100000
3.5 92300 70000
4 86150 66150 55400
4.5 81550 63100 51550
5 76150 59250 49250 30750
5.5 71550 56150 46150 30750
6 65400 49250 43850 30750 30000
7 56150 44600 39250 30750 28450 24750
8 46900 40000 34600 30450 26150 22750 19850
9 37700 34600 31550 27700 23850 20900 18300 15400
10 30750 29250 26450 23850 21750 19250 16900 14300
12 20750 18850 20000 18450 16600 14750 12450 10150
14 16150 14600 15000 15850 14450 12850 11000 8900
16 11150 11550 12300 11900 11250 9750 7900
18 8850 9450 10000 10400 9850 8700 7100
20 7700 8200 8450 8100 7750 6300
twenty two 6300 6750 6900 7300 7000 5600
twenty four 5600 5900 6150 5850 5000
26 4700 5000 5250 5250 4450
28 4100 4400 4600 4000
30 3450 3750 3850 3600
32 3150 3300 3100
34 2650 2850 2750
36 2300 2450
38 1900 2150
40 1750
42 1450
Magnification 14 11 8 5 5 4 3 3 3
Hook 100T hook 100T hook 70T hook 70T hook 70T hook 30T hook 30T hook 30T hook 30T hook
Hook weight: 1440kg Hook weight: 1116kg Hook weight: 726.6kg

 

2, jib lifting performance table

Auxiliary arm working range (m) The jib is fully rotated (360°)
Auxiliary arm mounting angle (°) Auxiliary arm mounting angle (°)
Arm length 12.5m Arm length 22.5m
15° 30° 15° 30°
Lifting weight (kg) Lifting weight (kg) Lifting weight (kg) Lifting weight (kg) Lifting weight (kg) Lifting weight (kg)
14 6200 6200
16 5800 4600 5800
18 5500 4450 3550 5500
20 5250 4300 3400 5250
twenty four 4900 4150 3100 3250 2150 4900
27 4600 3850 2700 3100 2000 4600
30 4300 3450 2600 2900 1850 4300
32 4000 3250 2550 2750 1750 4000
34 3700 3100 2450 2600 1700 3700
36 3550 2900 2400 2450 1600 3550
38 3250 2750 2300 2300 1550 3250
40 2750 2600 2250 2150 1450 2750
42 2300 2300 2150 2000 1400 2300
44 2000 2000 2100 1850 1300 2000
Hook 12t
Hook weight 172kg

★ Description of the lifting weight in the above lifting performance table

1) The value indicated by the rated lifting capacity in the table is the maximum lifting capacity that the crane can guarantee on a flat and solid ground. The starting amount does not exceed 75% of the tipping load;

2) The rated lifting weight in the table includes the weight of the hook and spreader;

3) The working range in the table is the actual value including the deformation amount of the boom, so the lifting work must be carried out based on the working range;

4) 75% of the tipping load considering wind 6, i.e. pressure of 125N / m allows up crane legs still fight when six jobs wind, and prohibits operation of the tire with the carrier tape job.

Reviews

There are no reviews yet.

Be the first to review “QY-100”

Your email address will not be published. Required fields are marked *